
Hado by Beyond
Information About the Property
HADO by Beyond is a low-density waterfront community on Dubai Islands, set within the Siora masterplan on Island B, around ten minutes from the Gold Souq metro station and under twenty minutes from Dubai International Airport. Three sculptural towers rise across twenty-one residential levels above landscaped gardens, opening toward the sea through corner glazing and layered terraces, with a calm, Japanese-inspired design language running throughout.
The project is developed by Beyond, the premium brand of Omniyat Group. Omniyat was founded in 2005 by Mahdi Amjad and ranks among Dubai's most established ultra-luxury developers, behind landmarks such as The Opus, One at Palm Jumeirah and The Lana, Dorchester Collection. Launched in 2024, Beyond carries that design-led pedigree into larger waterfront communities; its The Mural development was named Luxury Residential Project of the Year at the 2025 Pillars of Real Estate Awards, and Omniyat became the market leader in Dubai's USD 10 million-plus segment in the first half of 2025.
HADO offers a range of one, two and three-bedroom apartments alongside a limited collection of three- and four-bedroom duplexes and four-bedroom simplex homes, from roughly 768 sq ft to 4,785 sq ft. Interiors pair warm oak, natural stone and soft green accents with a generous 3.2-metre floor-to-ceiling height, and each residence is oriented to capture sea, cove or skyline views.
Within Siora, around 65–70% of the plot is given over to greenery and open space, some 140,000 sq m of landscape shaped by Japanese garden principles, with direct access to 6 km of beaches and more than 10 km of walking and cycling routes. Residents' amenities include The Cove pools, a wellness spa and yoga studio, gym, chef's kitchen, cigar lounge, kids' area and retail. Beyond the community, Dubai Islands is a 17 sq km Nakheel masterplan of five connected islands set to hold more than 80 hotels, six marinas and the Deira Mall. Homes are sold freehold on a 50/50 payment plan — 50% during construction and 50% on handover, financeable through a bank in the UAE, with completion anticipated in Q3 2029.
Payment Plan
Contact us to know more about our attractive payment plans and choose the one that best fits your needs.
.avif)














